Intel Details

China: Benxi Iron and Steel announces BF maintenance shutdown till 25 Sept'21

Finish Flat
28 Aug 2021, 10:23 IST
Steel Mint Intel

China's Benxi Iron and Steel has drawn up plans to conduct a 15-day overhaul of the 2,850 m3 blast furnace (No.6) from 25 Aug to 25 Sept'21. The maintenance shutdown will likely affect the total output of molten iron by about 100,000 t.

28 Aug 2021, 10:23 IST
You have 2 complimentary intel remaining! Stay informed with SteelMint
;